Skip to main content
$5M LIABILITY · WRITTEN WARRANTY REGISTERED · DESIGN-BUILD
Restored Toronto heritage semi, exterior and interior

Portfolio · 300+ GTA Projects

Renovation Projects Across Toronto and the GTA

Twelve case studies, from a $24K Beaches ensuite to a $780K Old Oakville rebuild. Each one lists the neighbourhood, scope, timeline and ticket, plus what the client needed solved. Rosedale heritage guts, Erin Mills legal suites, Yorkville condos and King West restaurants: real projects, real numbers, neighbourhood only.

  • 22+ Years
  • $5M CGL + WSIB
  • Written Warranty Registered
  • 300+ Projects
  • COI in 1 Business Day

Real Projects

Drag to Compare Before and After

Pick any project from the list to load its before and after photos.

Whole house renovation Toronto Rosedale after: restored open-plan main floor with original red oak Whole house renovation Toronto Rosedale before: dated 1920s heritage main floor with cracked plaster
Before After

Rosedale Heritage Whole-House Gut

2,400 sqft, full gut, 3 floors · 14 weeks · $287K

Restored a 1920s heritage semi with original red oak and a new structural span. Zero change orders; the kitchen island was settled in one design meeting.

Case Studies

All 12 Projects

Filter by budget, tier, neighbourhood or room. Every card links to the matching service and service area.

12 projects shown

Whole house renovation Toronto Rosedale before: dated 1920s heritage main floor with cracked plaster
Before
Whole house renovation Toronto Rosedale after: restored open-plan main floor with original red oak
After

Rosedale Heritage Whole-House Gut

Rosedale, Toronto

Ticket
$287K
Timeline
14 wks
Tier
Tier 3

Scope: 2,400 sqft, full gut, 3 floors

Restored a 1920s heritage semi with original red oak and a new structural span. Zero change orders; the kitchen island was settled in one design meeting.

Kitchen renovation Toronto Yorkville condo before: dated galley kitchen
Before
Kitchen renovation Toronto Yorkville condo after: Calacatta island and integrated appliances
After

Yorkville Condo Kitchen + Bath

Yorkville, Toronto

Ticket
$128K
Timeline
9 wks
Tier
Tier 2

Scope: Condo kitchen + bath gut (approx. 1,350 sqft unit)

Downtown condo gut with status certificate, board approval and building-management coordination. Finish date hit to the day.

Basement renovation Mississauga Erin Mills before: unfinished concrete basement
Before
Basement renovation Mississauga Erin Mills after: legal suite with egress window
After

Erin Mills, Mississauga

Ticket
$62K
Timeline
8 wks
Tier
Tier 2

Scope: Legal second-unit suite with egress windows (approx. 1,100 sqft)

Registered second-unit suite with egress windows and a written warranty. Inspection passed on the first visit; rental income started in month 5.

Basement renovation Toronto Forest Hill before: low damp 1930s basement
Before
Basement renovation Toronto Forest Hill after: underpinned suite with 9 ft ceilings
After

Forest Hill, Toronto

Ticket
$195K
Timeline
16 wks
Tier
Tier 3

Scope: Underpinned 1930s foundation + legal suite (approx. 1,800 sqft)

Underpinned a 1930s foundation to gain 9 ft ceilings, added interior perimeter drainage and built a legal suite.

Heritage home renovation Toronto Kingsway before: weathered Tudor facade
Before
Heritage home renovation Toronto Kingsway after: restored Tudor revival facade
After

Etobicoke Kingsway Heritage Facade

Kingsway, Etobicoke

Ticket
$250K-$400K range
Timeline
On schedule
Tier
Tier 3

Scope: Heritage facade preservation + open-plan interior

Preserved the heritage facade while opening the interior into a modern open plan.

Home addition Toronto area Thornhill before: rear yard before addition
Before
Home addition Thornhill Vaughan after: 600 sqft family room addition
After

Vaughan Thornhill Addition

Thornhill, Vaughan

Ticket
$410K
Timeline
18 wks
Tier
Tier 4

Scope: 600 sqft family-room addition + kitchen rebuild

Added a 600 sqft family room and rebuilt the kitchen in 18 weeks.

Retail fit out Toronto Yorkville before: stripped retail unit
Before
Retail fit out Toronto Yorkville after: flagship with custom display millwork
After

Yorkville Retail Flagship Fit-Out

Yorkville, Toronto

Ticket
$185K
Timeline
10 wks
Tier
Commercial

Scope: Retail flagship build-out with landlord approvals

Retail build-out with landlord approvals; the 10-week deadline was hit.

Office renovation Toronto Liberty Village before: dated loft office
Before
Office renovation Toronto Liberty Village after: workplace with glass meeting pods
After

Liberty Village Office Rebuild

Liberty Village, Toronto

Ticket
$164K
Timeline
On schedule
Tier
Commercial

Scope: Dated loft to 20-person workplace with meeting pods

Turned a dated loft into a 20-person workplace with meeting pods.

Kitchen renovation Toronto Leaside before: closed 1940s kitchen
Before
Kitchen renovation Toronto Leaside after: open main floor with new island
After

Leaside Kitchen + Open Main Floor

Leaside, Toronto

Ticket
$96K
Timeline
9 wks
Tier
Tier 2

Scope: 1940s main floor, wall removal + new kitchen

Removed a load-bearing wall with an engineered beam and moved the sink to a new island.

Bathroom renovation Toronto The Beaches before: dated ensuite
Before
Bathroom renovation Toronto The Beaches after: refreshed ensuite with zellige tile
After

The Beaches Ensuite + Powder Room

The Beaches, Toronto

Ticket
$24K
Timeline
5 wks
Tier
Tier 1

Scope: Ensuite refresh + powder room

Tier 1 refresh: new tile, vanity and fixtures without moving drains.

Luxury renovation Oakville before: 1960s bungalow on mature lot
Before
Luxury renovation Oakville after: custom great room with rift white oak
After

Old Oakville Luxury Rebuild

Old Oakville, Oakville

Ticket
$780K
Timeline
On schedule
Tier
Tier 4

Scope: Knockdown rebuild, approx. 3,600 sqft

Knockdown rebuild on a mature lot with rift white oak and a Wolf/Sub-Zero kitchen.

Restaurant renovation Toronto King West before: gutted restaurant space
Before
Restaurant renovation Toronto King West after: finished dining room and kitchen pass
After

King West Restaurant Build-Out

King West, Toronto

Ticket
$238K
Timeline
12 wks
Tier
Commercial

Scope: Dining room + commercial kitchen with new hood and grease interceptor

Full kitchen and dining build-out that passed health and fire inspections ahead of opening.

Quote requests reviewed within 1 business day

Want Your Project on This Page Next?

Tell us about your home or space. We review every request within 1 business day, visit the site and send a written scope with a hard-cap price before any design agreement.

  • Fixed price pre-design
  • $5M CGL + WSIB
  • Written warranty
Call (647) 800-3733 Free Written Quote